FAA lets Boeing increase 737 Max production almost two years after near-catastrophic accident

Neutral 0.0
The FAA had capped Boeing's production at 38 a month in early 2024 after a door plug blew out of a nearly new 737 Max 9.
Read Source Login to use Pulse AI

Pulse AI Analysis

Pulse analysis not available yet. Click "Get Pulse" above.

This analysis was generated using Pulse AI, Glideslope's proprietary AI engine designed to interpret market sentiment and economic signals. Results are for informational purposes only and do not constitute financial advice.