Grid connection delays hit £1.25bn McAlpine steel furnace job
Tata Steel is expecting a delay of up to a year in securing “critical” power to the £1.25bn electric arc furnace being built by Sir Robert McAlpine in Wales. The material-production giant said it had been told by National Grid that the electricity connection to… The post Grid connection delays hit £1.25bn McAlpine steel furnace job appeared first on Construction News.
AI brief
Pulse reads the full article- What happened
- Why it matters
- What to watch
Sign in to get the AI brief. Pulse explains what happened, why it matters, what to watch and who's exposed. Free for members.
Sign in to read the brief
