Galliford Try bypass job faces six-month delay and cost hike over utility diversions
A long-awaited bypass has been hit by further delays and spiralling costs due to water mains diversions. Galliford Try was awarded the contract for the Banwell Bypass in 2024, six months after original contractor Alun Griffiths walked out unexpectedly while enabling works were already underway.… The post Galliford Try bypass job faces six-month delay and cost hike over utility diversions appeared first on Constructi…
AI brief
Pulse reads the full article- What happened
- Why it matters
- What to watch
Sign in to get the AI brief. Pulse explains what happened, why it matters, what to watch and who's exposed. Free for members.
Sign in to read the brief
