ENR
· Oct 14, 2026 9:00 AM EDT
Not market news
Best Project — Highway/Bridge: SR 5 (US 1) and SR 811 (Alt A1A) Jupiter Federal Bridge Replacement
Replacing a structurally deficient bridge originally built in 1958 over the Loxahatchee River and the Atlantic Intracoastal Waterway called for a 915-ft bridge featuring a 267-ft twin double-leaf trunnion bascule main span.
AI brief
Pulse reads the full article- What happened
- Why it matters
- What to watch
Sign in to get the AI brief. Pulse explains what happened, why it matters, what to watch and who's exposed. Free for members.
Sign in to read the brief
