Data centre boom stretches London M&E capacity

Strong Bullish 93.5
London’s main contractors have been facing growing strain in mechanical and electrical (M&E) delivery with data centre demand stretching specialist subcontractor capacity, according to a new industry survey. The latest London Main Contractor Survey 2026 by consultancy Aecom found that shortages in M&E trades was…
The post Data centre boom stretches London M&E capacity appeared first on Construction News.
Read Source Login to use Pulse AI

Pulse AI Analysis

Pulse analysis not available yet. Click "Get Pulse" above.

This analysis was generated using Pulse AI, Glideslope's proprietary AI engine designed to interpret market sentiment and economic signals. Results are for informational purposes only and do not constitute financial advice.