Gallery: HS2 completes Coleshill viaduct decks at Delta junction
Bullish
50.0
Engineers from the Balfour Beatty Vinci (BBV) joint venture have completed the installation of four parallel viaduct decks at HS2’s Delta junction outside Birmingham. The structures form part of the high-speed rail route as it approaches Birmingham from the south, carrying the high-speed line over…
The post Gallery: HS2 completes Coleshill viaduct decks at Delta junction appeared first on Construction News.
The post Gallery: HS2 completes Coleshill viaduct decks at Delta junction appeared first on Construction News.
Pulse AI Analysis
Pulse analysis not available yet. Click "Get Pulse" above.
This analysis was generated using Pulse AI, Glideslope's proprietary AI engine designed to interpret market sentiment and economic signals. Results are for informational purposes only and do not constitute financial advice.